Sunday, June 24, 2012





Amendoim floor repair we had to remove the water damaged flooring at the front door and replace some plywood.The floor was BR-111 it will take a few months for the floor to amber to match the existing floor,even the floor under the rug was a different shade than what was in the light.

No comments:

Post a Comment