Sunday, August 4, 2013

Floor refinishing Concord, N.C.

Refinished a existing 1 1/2 x 3/4 hardwood floor in Concord, N.C. we used






natural finish with a oil base polyurethane.

Thursday, July 18, 2013

Installing Brazilian Cherry floor in the Nine West shoe store in Concord Mills mall





Hardwood Floors looking cupped make sure you check the moisture content of the wood before sanding and refinishing.

Thursday, May 23, 2013

Removed carpet on the stairs and landing in Huntersville,N.C. and installed strand woven bamboo treads and risers









.

Sunday, March 24, 2013





Hardwood floor installation in Mooresville, N.C. Installed new 2 1/4 x 3/4 red oak in the family room, sand stain and finish the new floors and the existing hardwood floors on the first level.

Friday, February 15, 2013





Installed 3 1/4 x 3/4 select red oak Somerset flooring in Huntersville, N.C. going back this week to start sanding